Slab pre-pour inspection in Officer

The last look at the steel, pods, vapour barrier and plumbing before concrete covers them for good.

  • Formwork, steel and pods in, the day before concrete
  • About 1 hour on site
  • Report within 24 hours
Request your quoteSend your details and an Officer inspector will phone you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookFormwork, steel and pods in, the day before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Officer slab pre-pour inspection

  • Concrete cover measured at edges and beams
  • Bar chairs in place and evenly spaced
  • Mesh laps and step bars to length
  • Beam widths kept between pods
  • Vapour barrier down the beams to ground
  • Barrier joints and penetrations taped
  • Plumbing penetrations clear of mesh
  • Pipe ends capped
  • Garage and wet area set-downs formed
  • Formwork straight and braced
  • Corners and re-entrant bars fixed
  • Slab layout against the engineering
  • Termite collars where specified
Why it matters here

Slab pre-pour inspections on Officer builds

Officer slab findings tend to be about cover and continuity: steel sitting too close to the edge, a vapour barrier stopping short of the beams, bars across a footing step left too short. Each is a short fix before the truck arrives.

What we find at this stage in Officer

  • Concrete cover below the minimum
  • Underslab membrane stopping above the edge beams
  • Step bars under 300mm
  • Beam widths narrowed by moved pods
  • Mesh sagging between chairs
  • Pipe ends left uncapped
Slab mesh sagging between supports, so the concrete cover will vary across the pour, found during a slab pre-pour inspection in Officer
Slab mesh sagging between supports, so the concrete cover will vary across the pour
Sample findings

Sample defects found during our slab pre-pour inspections in Officer

Annotated findings from Slab pre-pour inspections.

Steel sitting too close to the edge, leaving less concrete cover than required, found during a slab pre-pour inspection in Officer
Steel sitting too close to the edge, leaving less concrete cover than required
Vapour barrier stopping short of the edge beams instead of running down to ground, found during a slab pre-pour inspection in Officer
Vapour barrier stopping short of the edge beams instead of running down to ground
Bars across a footing step extended less than the 300mm the detail needs, found during a slab pre-pour inspection in Officer
Bars across a footing step extended less than the 300mm the detail needs
Pods shifted so the beam between them is narrower than the plans require, found during a slab pre-pour inspection in Officer
Pods shifted so the beam between them is narrower than the plans require

The other stages of a Officer build

  1. Bored piers inspection in Officer1Bored piersHoles bored and cleaned, before the pier concrete
  2. Frame inspection in Officer3FrameWalls and trusses up and braced, before wrap and insulation
  3. Lock-up (pre-plaster) inspection in Officer4Lock-up (pre-plaster)Roof, windows and cladding on, before plasterboard
  4. Fixing inspection in Officer5FixingDoors, mouldings and cabinets in, before painting
  5. Waterproofing inspection in Officer6WaterproofingOnce the membrane has cured, ahead of tiling
  6. Pre-handover (PCI) inspection in Officer7Pre-handover (PCI)Roughly seven days out from your PC date

All construction stage inspections in Officer →

Guides

Construction stage guides for Officer

All guides →

Book a slab pre-pour inspection in Officer

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Officer: common questions

What is concrete cover and why does it matter?

Cover means how much concrete sits between the reinforcement and the outer surface. Too little and moisture reaches the steel, which rusts and cracks the slab over the years.

Why does the vapour barrier need to go down the beams?

So ground moisture cannot wick up through the edge of the slab. A barrier that stops at the top of the beam leaves a gap.

How much notice do you need before the pour?

A day or two is best. Tell us as soon as the pour is booked so we can fit around the program.

Will this delay my pour?

Most items are fixed in under an hour. Whether the pour moves is between you and the builder.

Do you test the plumbing under the slab?

No. We check penetrations, capping and clearance to the mesh. Any pressure test falls to the licensed plumber.

What can be checked after the pour?

Only surface items such as edge finish and honeycombing. Everything inside the slab is hidden for good.