Flashings, ledges and roof tiles at an Officer handover

The roof and external junction items that turn up at practical completion.

Officer 3809 · 14 July 2026

In short: Roof and junction items let water in slowly, which is why they need to be on the handover list.

Open flashings

We have recorded a lower roof flashing left so incomplete that roof framing was visible from the ground.

Ledges at cladding changes

Where two claddings meet, a rendered ledge without a flashing holds water against the wall.

Capping junctions

Pressure flashing at a capping junction that does not suit it is another repeat item.

Tiles

Cracked tiles are often still in place at handover. They are simple to replace now and costly later.

Written by our local inspection team from work carried out in Officer. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More pci / handover guides for Officer

All guides →

Book a building inspection in Officer

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Officer owners ask about this

Does the inspector get up onto the roof?

Where safe, or we use a drone.

Is a cracked tile a big deal?

It lets water through to the sarking and then the ceiling.

Who fixes it?

The builder, before handover.

Will the report show where?

Yes, with photos and locations.